Identifying and Investigating Factors Affecting the Delay of EPC Projects in Iran's Railways(In the engineering phase, Logistics Phase and Implementation Phase)

Document Type : Original Article

Authors

1 M.Sc., Grad., Department of Technical Engineering, Islamic Azad University Miyaneh Branch, Iran.

2 Assistant Professor, Department of Technical Engineering, Islamic Azad University Miyaneh Branch, Iran.

Abstract

The projects that the Islamic Republic of Iran Railways, in the form of EPC, is entrusted to parent company companies are among the most important projects in Iran. In the meantime, the problems in the various phases of the project, including the engineering phase, the procurement phase, and the implementation phase, are very controversial in the project's main factors, such as project time, project cost, and project quality, and it is very important to provide solutions for them. In this research, after identifying delays in Iranian Railways projects, their hierarchical analysis will be applied to their prioritization. Usually many of the country's development projects are delayed, and these delays have many effects. Increasing project completion time, increasing project costs, not achieving the required quality, including the consequences of delay. These problems can cause disagreements between project stakeholders and all require time, cost and energy. Therefore, identifying and prioritizing delays in rail project projects is a prerequisite for the implementation of this research. The research gaps in these studies reveal the need for this research.

Keywords


-خیاط، ق.، (1393)،­ "شناسایی و اولویت­بندی عوامل موثر بر تاخیر در اجرای پروژه­های ساختمانی در شهر اهواز، اولین کنفرانس ملی توسعه عمرانی کلانشهرها با رویکرد سرمایه گذاری، اهواز، دانشگاه آزاد اسلامی واحد اهواز. 
 
 -ریاحی وفا، (1395)، "بررسی، آسیب‌شناسی و اولویت‌بندی عوامل موثر در بروز تاخیرات پروژه­های اجرای خطوط اصلی شرکت آب و فاضلاب تهران توسط پیمانکار"، پایان‌نامه کارشناسی ارشد، دانشگاه پیام نور استان البرز.
 
-Arani A. A. M., Hajusefloo, H. Kh., Moradi, M., Farahani, A., (2010), “Development of a forward Chain approach for calculating self-delay of project activities­”, Journal of Industrial Engineering International, Vol. 6, No. 10.
 
-Braimah, N., (2008), “An  investigation  into  the use of construction delay and disruption analysis methodologies­,  A  thesis  submitted  in  partial  fulfillment  of  the  requirement  of  the  University  of  Wolverhampton for the Degree if Doctor of Philosophy.
 
-Castro, J., Gomez, D., and Tejada J., (2008), “A polynomial rule for the problem of costs in PERT Networks”­, Computers & Operations Research 35, pp. 2376-­2387.
 
-Doloi, H., Sawhney, A., Iyer, K.C., Rentala, S.,­)2012(, “Analysing factors affecting delays in Indian construction projects, International Journal of Project Management”, 30,
pp.479-489.
 
-Sambasivan, M. and Soon, Y. W.,) 2007­(, “Causes and effects of delays in Malaysian Construction industry”, International Journal of Project Management 25, pp. 517-­526.
 
-Surendran K.V., Shankar C., (2017), “Identification of influencing factors causing Delays in Construction  project by Factor Analysis, International Research Journal of Engineering and Technology”, Vol. 04.
 
-Williams, T., (2010­), “Assessing Extension of Time delays on major projects International Journal of Project Management”, 21,
pp.192-200.