Analysis and Evaluation of Airport Development Plans in Airport Passenger Transportation Capacity: The Effect of Runway and Apron Construction by Simulation Method, A Case Study of Imam Khomeini Airport

Document Type : Original Article

Author

Assistant Professor, Faculty of Civil, Water and Environmental Engineering, Shahid Beheshti University, Tehran, Iran.

Abstract

The efficiency of a transportation system is generally measured in terms of its ability to efficiently process the unit and the displaced element. The performance of any system depends on the performance of its components, and an evaluation of each of these components is necessary to determine the overall capabilities of the system. The evaluation of the components of a system is measured by determining and examining its capacity. The runway and apron are important components of the airport system, the exact capacity of which is important and significant. In this article, the runway and apron capacity of Imam Khomeini Airport in 1397 (base year) has been calculated and evaluated and evaluated for the project year (opening of the second runway terminal and terminal No. 2 of the airport) for two scenarios with and without night stop. The results show that the runway capacity is only for the landing operation of 34 aircraft per hour, only the take-off operation of 41 aircraft per hour and for the combined operation of 56 aircraft per hour. The capacity of the apron is 62 places in the base year with the night stop scenario and 28 places for the non-stop night scenario, which are 81 places for the horizon year and 57 places for the night and no night scenarios, respectively.

Keywords


-Bazargan, M., Fleming, K. and Subramanian, P., (2002), “A simulation study to investigate runway capacity using TAAM, In Proceedings of the Winter Simulation Conference”, Vol. 2,
pp. 1235-1243.
-Cai, K., Li, W., Ju, F. and Zhu, X., (2018),
“A scenario-based optimization approach to robust estimation of airport apron capacity”, In 2018 Integrated Communications, Navigation, Surveillance Conference (ICNS),  pp. 3A1-1. IEEE.
-Cetek, C., Cinar, E., Aybek, F. and Cavcar, A., )2014(, “Capacity and delay analysis for airport manoeuvring areas using simulation”, Aircraft Engineering and Aerospace Technology: An International Journal.
-Gelhausen M. C., (2011), “Modelling the effects of capacity constraints on air travelers”, airport choice, Journal of Air Transport Management, 17, pp.116- 119
-Horonjeff R, Mckelevey F X, Sproule W. J. and Young S B., (2010), “Planning and design of airports”, 5th edition, McGraw Hill.
-Janic M., (2008), “Modelling the capacity of closely-spaced parallel runways using innovative approach procedures Transportation Research Part C”, 16, pp.704– 730.
-Lei, J., Chong, X., Chen, D., Chen, Z. and Chen, Q., (2020), “A review of airport runway capacity evaluation model”, In IOP Conference Series: Materials Science and Engineering, Vol. 780,
No. 7, pp.7-19.
-Majid, S.A., Larasati, E.R., Rizaldy, W., Setiawan, E.B., Pahala, Y., Agusinta, L., Ricardianto, P. and Hernawan, M.A., (2021), “The Capacity of Runway of Ngurah Rai International Airport Bali Based on The Doratask Method”, Journal of Contemporary Issues in Business and Government, 27(1), pp.2022-2039.
-Mirkovic B., (2011), “Airport Apron Capacity Estimation – Model Enhancement, Procedia Social and Behavioral Sciences 20, 
pp.1108–1117.
-Mirkovic, B. and Tosic, V., (2014), “Airport apron capacity: estimation, representation, and flexibility”, Journal of Advanced Transportation, 48(2), pp.97-118.
-Mirković, B. and Tošić, V., 2015. Functional relationship between the runway system and apron/gate area under different demand characteristics. Transportation Research Procedia, 10, pp.891-899.
-Mirković, B., Tošić, V., Kanzler, P. and Höhenberger, M., (2017), “Airport apron roundabout–Operational concept and capacity evaluation”,Transportation Research Part C: Emerging Technologies, 80, pp.439-453.
-Nõmmik, A. and Antov, D., (2020), “European Regional Airport: Factors Influencing Efficency”, Transport and Telecommunication Journal, 21(3), pp.211-220.
-Sun, H.Y. and Liu, Y.X., (2019), “Research on Long Parallel Runway Capacity in Different Operation Modes”, Aeronautical Computing Technique, pp. 5.
-Tascón, D.C. and Olariaga, O.D., (2021), “Air traffic forecast and its impact on runway capacity A System Dynamics approach”, Journal of Air Transport Management, 90, pp.1019-1046.
-Tee, Y.Y. and Zhong, Z.W., (2018), “Modelling and simulation studies of the runway capacity of Changi Airport”, The Aeronautical Journal, 122(1253), pp.1022-1037.
-Tosic, V.S.T. and Mirkovic, B.M., (2013), “Airport apron capacity: estimation”, representation, and flexibility, Journal of Advanced Transportation, 48, pp.97–118.
-Wei, G. and Taobo, W., (2010), “Notice of Retraction: A Simulation Study on airport capacity and the factors”, In 2010 3rd International Conference on Computer Science and Information Technology, Vol. 8, pp. 390-393, IEEE.
-Xiong, L.I., Chen, X.Q. and Wei, D.X., 2017. Simulation Analysis of Airport Parallel Runway Capacity under Different Operating Modes. DEStech Transactions on Environment, Energy and Earth Sciences, (ese).