Evaluation of Factors Affecting Bridge Management Using Hierarchical Analysis (AHP)

Document Type : Original Article

Authors

1 M.Sc., Grad., Department of Engineering‌, Pardis Branch, Azad University‌, Pardis Branch, Tehran, Iran.

2 Assistant Professor, Housing & Urban Development Research Center, Tehran, Iran.

Abstract

Bridges are the key element of land transportation, and due to the large number and cost of construction, the maintenance of these huge assets is very important. As the financial resources are usually limited, selecting and prioritizing bridges for maintenance is complicated. Therefore, by using bridge management system (BMS) software, bridge maintenance is done more quickly and accurately. In this study, using the Hierarchical Analytical System (AHP) method, first the criteria and parameters affecting the management of the bridge have been determined and then the importance of the mentioned parameters has been studied and analyzed based on the opinion of experts. Finally, it has been concluded that "design according to codes and regulations", "quality of materials" and "quality and accuracy of construction" are the most important criteria that must be considered before starting the operation of the bridge. Furthermore, effective parameters in bridge management system software are "user safety", "type, number and severity of defects" and "maintenance costs". Thus, the desired criteria and parameters according to the priority can be used in prioritization models and budget allocation.

Keywords


- جغتایی، ع.ر. و علیخانی، ا.، (1389)،­" نگهداری پل‌ها بر اساس آشتو وسایر منابع"، چاپ اول، موسسه انتشارات علمی دانشگاه صنعتی شریف.
-صائمی، ح. و خزایی، ص.، (1395)، " ارایه الگوی مدیریت کیفیت در پروژه­های پل سازی"، نشریه پژوهش­های نوین علوم مهندسی، تهران.
- قره، س .بینا، ک. و فرشته­پور، ا.، (1398)،"­اولویت­بندی ترمیم و بازسازی پل­های بتنی شبکه راه های استان خراسان رضوی با استفاده از روش تحلیل سلسله مراتبی"، نشریه مهندسی سازه و ساخت. دوره 6.
- نصر آزادانی، س.م. اشتهاردیان، ا. و بشیری راد، ف.، (1388)، "ارتقای توان تعمیر و نگهداری پل‌ها با اولویت‌بندی - مشکلات موجود"، اولین همایش ارتقای توان داخلی با رویکرد ساخت داخل، تهران، مرکز مطالعات تکنولوژی، دانشگاه صنعتی شریف.
- یلداشخان، م. و شمالی، آ.، (1385)،" مدیریت پل"، وزارت راه و شهرسازی، معاونت آموزش، تحقیقات وفناوری، پژوهشکده حمل و نقل.
 
-De Brito, J., Branco, F. A., Thoft-Christensen, P., & Sørensen, J. D., (1997), “An expert system for concrete bridge management”, Engineering Structures, 19(7), pp.519-526
-Enright, M. P., & Frangopol, D. M., (1999), “Maintenance planning for deteriorating concrete bridges”, Journal of Structural Engineering, 125(12),
pp.1407-1414.
-Furuta, H., Kayano, M., & Watanabe, E., (2007), “Current status and future issues on bridge maintenance and bridge management system”, J Jpn Soc Civ Eng F, 63(3), pp.287-294.
-Gholami, M., Sam, A. R. B. M., & Yatim, J. M., (2013), “Assessment of bridge management system in Iran”, Procedia Engineering, 54, pp.573-583.
 
 
 
-Lee, C. K., & Kim, S. K., (2007),
“GA-based algorithm for selecting optimal repair and rehabilitation methods for reinforced concrete (RC) bridge decks”, Automation in construction, 16(2),
pp.153-164.
-Miyamoto, A., & Motoshita, M., (2015), “Development and practical application of a bridge management system (J-BMS) in Japan”, Civil Engineering Infrastructures Journal, 48(1), pp.189-216.
-Pellegrino, C., Pipinato, A., & Modena, C., (2011), “A simplified management procedure for bridge network maintenance”, Structure and Infrastructure Engineering, 7(5), pp.341-351.
-Rashidi, M., Ghodrat, M., Samali, B., Kendall, B., & Zhang, C., (2017), “Remedial modelling of steel bridges through application of analytical hierarchy process (AHP)”, Applied Sciences, 7(2), pp.168.
-Suthanaya, P. A., & Artamana, I. B., (2017), “Multi-criteria Approach for Prioritizing Bridge Maintenance in Developing Country (Case Study of Bali Province, Indonesia)”, Asian Journal of Applied Sciences (ISSN: 2321–0893), 5(02).
-Tonias, D. E., & Zhao, J. J., (1995), “Bridge engineering: design, rehabilitation, and maintenance of modern highway bridges”, McGraw-Hill.
-Valenzuela, S., de Solminihac, H., & Echaveguren, T., (2010), “Proposal of an integrated index for prioritization of bridge maintenance”, Journal of Bridge Engineering, 15(3), pp.337-343.