Modeling the delay of urban bus services and technical-economic analysis of delay reduction

Document Type : Original Article

Authors
1 M.Sc., Grad., Department of Civil Engineering, Faculty of Engineering, Ferdowsi University of Mashhad, Iran.
2 Associate Professor, Department of Civil Engineering, Faculty of Engineering, Ferdowsi University of Mashhad, Iran.
3 Ph.D., Grad., Department of Traffic Safety, Faculty of Traffic Sciences and Technologies, Amin Police University, Tehran, Iran
Abstract
Punctuality of bus fleet movement in urban public transportation systems is one of the main foundations of passenger satisfaction. The present study aims to quantify the delay rate of bus services and identify the most effective methods to reduce it on urban routes. The study area is the bus network of Shiraz metropolitan city. To achieve the research objectives, field data including the number of boarding and alighting passengers, number of stations, dwell time at each station, and fare payment method (cash or electronic card) were collected from 28 buses operating on 14 main routes. Using multiple linear regression analysis, a model for estimating delay time was developed. Findings indicate that the number of boarding and alighting passengers, dwell time at stations, number of stations, and use of electronic fare cards (with negative effect) have the greatest share in predicting delay, respectively. Based on the results, replacing cash payments with electronic cards can reduce delay time by up to 32 percent. Additionally, constructing bay stops and developing intelligent information display systems are introduced as the most effective technical-economic solutions.
Keywords

-اسماعیل‌پور، اشکان و خاکسار، حسن (۱۴۰۱). مدل سازی توسعه سیستم اتوبوس تندرو در معابر شهری. مطالعات مدیریت ترافیک، ۱۷(۶۴). 140-113
-الله‌دادی، مهدی، شماعی، علی و ساسان‌پور، فرزانه (۱۳۹۸). بررسی حمل و نقل عمومی و ارزیابی خطوط اتوبوس تندرو کلانشهر اصفهان مطابق با استاندارد ۲۰۱۶ BRT. مطالعات شهری، ۹(۳۳). 14-3.
-طاهرخانی، حامد و طاهریان، آرش (۱۳۹۶). زمانبندی حرکت اتوبوسهای BRT با در نظر گرفتن محدودیت های ترافیکی حاصل از زمان های متغیر چراغ های راهنمایی و رانندگی. مدیریت شهری، ۱۶(۴۷). 530-523.
-عدلی، مهران و جعفری حقیقت‌پور، پگاه (۱۳۹۷). پیش بینی و بهینه سازی مدل زمان تاخیر مسافران اتوبوس به منظور افزایش رضایت­مندی مسافرین. سومین کنفرانس ملی پژوهشهای کاربردی در مهندسی عمران، معماری و مدیریت شهری.
-کی‌منش، محمودرضا و پروینی، امیرمحمد (۱۴۰۲). طراحی شبکه اتوبوس تندرو با لحاظ کردن تقاضای سفر (مطالعه موردی شهر کرج). مهندسی سازه و ساخت، ۱۰(۴). 22-5.
-کی‌منش، محمودرضا و پروینی، امیرمحمد (۱۴۰۳). تحلیل حساسیت شاخص­های ارزیابی حمل و نقل در صورت تغییرات سرفاصله اتوبوس تندرو. مهندسی حمل و نقل، ۱۶(۱).۴۱۵۹-۴۱۷۵
-ماهپور، علیرضا (۱۴۰۰). مدلسازی و ارزیابی عوامل موثر بر رضایت کاربران سیستم حمل و نقل همگانی: مطالعه موردی مترو و اتوبوس تندرو شهر تهران. جاده، ۲۹(۴). 187-171.
-Al Huzomi, H., & Setiaji, B. (2025).A systematic review of bus delay factors in BRT systems: A comprehensive analysis of operational, infrastructural, and external determinants. Transport Reviews, 45(2),
234-258.
-Asimeng, E. T. (2025). Bus rapid transit implementation challenges in African cities:A case study of institutional and financial barriers. Case Studies on Transport Policy, 13, 100-116.
-Gaya, C., Ferreira, M., & Cunha, I. (2016).Bus arrival time and occupancy prediction models: A comparative study of survival analysis and linear regression approaches. IEEE Transactions on Intelligent Transportation Systems, 17(8), 2212-2222.
-Karakurt, A. (2025). Deciphering the dynamics of bus rapid transit delays: A decision trees and Bayesian networks approach for Istanbul’s Metrobus system. Jurnal Teknik Sipil, 21(1),
1-18.
-Khan, A., & Tabassum, S. (2025).Socio-economic impacts of bus rapid transit project delays in developing cities: A case study of Peshawar. Transport Policy, 142, 89-104.
-Kim, S., Lee, J., & Park, S. (2017). Hidden costs of construction delays in urban transit projects: Economic and social implications of extended implementation periods. Journal of Construction Engineering and Management, 143(9), 04017058.
-Shockley, D. B. (2023). The impact of smart card fare payments on transit bus dwell time: An empirical analysis of boarding efficiency. Transportation Research Record, 2677(5), 112-125.
-Wang, L., & Zhou, H. (2010). Governance and efficiency of urban bus services in Chinese megacities: A DEA and regression analysis. Transportation, 37(3), 511-528.
-Yang, Y., Li, S., & Wang, Z. (2024). Two-stage scheduling optimization for bus rapid transit corridors under time-dependent demand. Transportation Research Part C: Emerging Technologies, 158, 104-122.
-Zhang, Q., Ma, Z., & Jenelius, E. (2024). Real-time bus arrival delays analysis using seemingly unrelated regression model: Capturing heterogeneous spatiotemporal effects. Transportation, 1-28. [Online first]
-Zhang, Q., Ma, Z., Wu, Y., Liu, Y., & Qu, X. (2025). Quantifying variable contributions to bus operation delays considering causal relationships: A causality-based explainable AI approach. Transportation Research Part E: Logistics and Transportation Review, 184, 103881.
-Zhang, Y., Liu, H., & Chen, W. (2023). Causal discovery for bus delay propagation analysis: A method integrating spatiotemporal data with explainable AI. Multimodal Transportation, 2(3), 100045.
-Zhao, F., & Li, M. (2023). Calibration of highway-transit speed relationships for improved transit network modeling in urban corridors. Florida Department of Transportation Research Report, 1-85.