The Reviews Kfbnd Eliminated in the Consolidation of the Basic Structure of the NATM Excavation Method Using Data Analysis Instrumentation (Case Study: Subway Line A Qom)

Document Type : Original Article

Author

Abstract

In the non-mechanized Tunnel Drilling projects of or the same new method to NATM tunneling Austrian who is known one of the steps to consolidate the implementation temporary structures, construction and installation the tunnel is Kfbnd. In this paper, with a case study conducted in the areas of Qom subway tunnel and tunnel behavior in different time zones without installing instrumentation Kfbnd data has been analyzed And have reached to the conclusion that the tunnel without installing Kfbnd retained their stability and do not only makes the very much economic save in the project will be. But also caused enhances the speed in the tunnel is Level completed. Tunnel for drilling in projects are usually advance after certain amount of work to be done to stop lining operations. According to the survey conducted in this paper proposes to install temporary to consolidate in step Kfbnd been refused and speed dig up and sooner began lining operations.
.
 
 
 
 

Keywords


-         بخشی پور صداپشته ، آرش.1392،  بررسی عوامل تاثیر گذار بر نتایج ابزاردقیق در تونل‌های غیره مکانیزه (NATM) مترو قم­، سمینار کارشناسی ارشد مهندسی زلزله، دانشگاه آزاد اسلامی شبستر.-         موسسه حرا، دفترفنی کارگاه خط A مترو قم. 1392، گزارش نتایج و تحلیل‌های داده‌های ابزاردقیق در رابطه با عدم نصب کفبند.
 -         موسسه حرا، دفتر فنی کارگاه خط A مترو قم.1390، 1391 و 1392،گزارش روزانه قرائت پای کار ابزاردقیق.
 -         راهنمای استفاده از متر همگرایی­سنج، 1390، شرکت مهندسین مشاور پایاب زمزم.
 -         معاونت امور فنی، دفتر امور فنی و تدوین معیارها؛ رفتار سنجی فضاهای زیرزمینی در حین اجراء (نشریه 252)، انتشارات سازمان مدیریت و برنامه ریزی کشور، 1381.
 -         پروژه خط A مترو قم. 1389، مطالعات مفهومی.