-Aeini, M. (1389). Mehr Housing: Improving the pattern of urban land consumption and improving the quality of urban life. Journal of Economics and Housing, Nos. 47 and 78. [In Persian]
-Ahmadvand, Massoud and Eghbali, Hossein and Kobraei Abkenar, Shokofeh and Maghamipour, Fakhreddin. (1395). Risk assessment in the construction industry, International Conference on Civil Engineering, Tehran. [In Persian]
-Ahmadi, Seyed Vahid (1384). Investigating the role and position of the government in providing housing, Trend Quarterly, 46, 41-66. [In Persian]
-Al-Bahar, J. F., & Crandall, K. C. (1990). Systematic risk management approach for construction projects. Journal of Construction Engineering and Management, 116(3), 533-546.
-Al-Maghraby, R. (2012). Mega Projects on Egypt’s Horizon. PM World Journal, I, (3).
-AlSehaimi, A., Koskela, L., & Tzortzopoulos, P. (2013). Need for alternative research approaches in construction management: Case of delay studies. Journal of Management in Engineering, 29(4), 407-413.
-Askari and Chegni (1386). The effect of housing facilities on the development of private sector investment. Scientific Quarterly of Housing Economics, No. 41. [In Persian]
-Azad Rad, Hamid. (1396). Presenting a model to evaluate the cost and time control of construction projects with risk management approach in mass construction projects (Case study of Iran Mall large market), Master Thesis in Construction Management, Islamic Azad University, Safadasht Branch. [In Persian]
-Banihashemi, S., Hosseini, M. R., Golizadeh, H., & Sankaran, S. (2017). Critical success factors (CSFs) for integration of sustainability into construction project management practices in developing countries. International journal of project management, 35(6), 1103-1119.
-Chitkara, K. K. (1998), Construction Project Management, New Delhi. Tata McGraw-Hill Education, p. 4, ISBN 9780074620625, retrieved May 16, 2015.
-Georgieva, T. M. (2012). Research Infrastructure Megaproject (RIMPS) management in an ecosystem perspective. Organization, Technology & Management in Construction, 4.
-Ghaffarian Rad, Maryam and Majid Parchami Jalal. (1394). Review of Engineering Insurance with Emphasis on the Status of Building Quality Assurance in Urban Construction System, 3rd International Congress of Civil Engineering, Architecture and Urban Development, Tehran, Permanent Secretariat of the International Congress of Civil Engineering, Architecture and Urban Development, Shahid Beheshti University. [In Persian]
-Haj Bagheri, Mansour and Sadeghi, Farzad. (1389). Investigating the Risk Management Situation in the Construction Industry, Sixth International Conference on Project Management, Tehran. [In Persian]
-Hopkinson, M. (2007, October). Ten causes of megaproject failure. In APM Conference the Business of Projects, Vol. 30, 31-32.
-Hussain, A. (1979). Construction productivity factors. Issues in Engineering. Journal of Professional Activities, 105(4), 189-195.
-Jafari, Toofan. (1396). Investigating the Relationship between Ethical Leadership and Productivity of Construction Projects (Effective Ethical Leadership Theory). PhD Thesis in Project Management, University of Tehran. [In Persian]
-Kartam, N. A., & Kartam, S. A. (2001). Risk and its management in the Kuwaiti construction industry: a contractors’ perspective. International Journal of Project Management, 19(6), 325-335.
-Katsarakis, Y., Rezk, A., Sazak, E., Shaydullin, H., & Yadikar, B. (2007). Turkey & The Construction Services Cluster. Microeconomics of Competitiveness-Spring.
-Khorami, Morteza and Rafiei, Hassan and Shafaei, Saeed, (2005). The need to upgrade the country's construction industry from the perspective of quality management, Fourth International Conference on Quality Management, Tehran. [In Persian]
-Nadali (1386). The secondary mortgage market and its role in providing housing for low-income groups. Journal of Housing Economics, No. 42, Winter. [In Persian]
-Nunnally, S. W. (2006). Construction methods and management (Vol. 3). Prentice Hall.
-Okoye, P. U., Ngwu, C., & Ugochukwu, S. C. (2015). Evaluation of management challenges facing construction practice in Nigeria. International Journal of Application or Innovation in Engineering & Management, 4(1), 19-28.
-Olawale, Y. A., & Sun, M. (2010). Cost and time control of construction projects: inhibiting factors and mitigating measures in practice. Construction Management and Economics, 28(5), 509-526.
-Othman, E., A., A. (2013). Challenges of mega construction projects in developing countries. Organization, technology & management in construction, An International Journal, 5(1), 730-746.
-Pournader, M., Tabassi, A. A., & Baloh, P. (2015). A three-step design science approach to develop a novel human resource-planning framework in projects: the cases of construction projects in USA, Europe, and Iran. International Journal of Project Management, 33(2), 419-434.
-Rainkhah, Amir and Hosseini, Abdullah (1394). Investigating the Challenges of Building Industrialization in Iran and Proposing Practical Solutions, 3rd International Congress on Civil Engineering, Architecture and Urban Development, Tehran. [In Persian]
-Rezazadeh Razieh and Otadi Tahereh (1387). Survey of Housing Needs Due to Changes in Population Structure in Tehran, International Journal of Engineering Sciences, Vol. 19, Number 10-b. [In Persian]
-Rezakhani, P. (2012). A review of fuzzy risk assessment models for construction projects. Slovak Journal of Civil Engineering, 20(3), 35-40.
-Sabt, Mohammad Hassan, Mokhtariani, Mahmoud. (1395). Evaluate and analyze the Iranian manufacturing industry and provide solutions to improve it. Journal of Civil Engineering Amirkabir, 48 (2), 111-120. [In Persian]
-Soomeloo, (1389). Mehr Housing: A Structural Turnaround in Housing Policies and Its Achievements. Scientific Quarterly of Housing Economics, Nos. 47 and 48. [In Persian]
-Shah Hosseini, Vahid and Vajdani, Ahmad and Amiri, Omid (2012). The role of industrial construction in the development of the country and the challenges of its implementation, the Third International Conference on Construction Industry, Tehran. [In Persian]
-Tabassi, A. A., & Bakar, A. A. (2009). Training, motivation, and performance: The case of human resource management in construction projects in Mashhad, Iran. International Journal of Project Management, 27(5), 471-480.
-Tadayon, M., Jaafar, M., & Nasri, E. (2012). An assessment of risk identification in large construction projects in Iran. Journal of Construction in Developing Countries, 17.
-Toor, S. U. R., & Ofori, G. (2008). Developing construction professionals of the 21st century: Renewed vision for leadership. Journal of Professional Issues in Engineering Education and Practice, 134(3), 279-286.
-Wang, S. Q., Dulaimi, M. F., & Aguria, M. Y. (2004). Risk management framework for construction projects in developing countries. Construction Management and Economics, 22(3), 237-252.
-Yap, J. B. H., Chow, I. N., & Shavarebi, K. (2019). Criticality of construction industry problems in developing countries: Analyzing Malaysian projects. Journal of Management in Engineering, 35(5), 04019020.
-Zakeri, M., Olomolaiye, P. O., Holt, G. D., & Harris, F. C. (1996). A survey of constraints on Iranian construction operatives' productivity. Construction Management & Economics, 14(5), 417-426.
-Zarini and Mehregan (1386). Effect of construction cost based on housing price. Scientific Journal of Housing Economics, No. 41, Fall. [In Persian]